Occurrence Switching Generator

Created by DEWA-DP-DCC Team

100%
Get the MV diagram into this app in one click
Set up

Drag this button into your favourites bar:

Open in OSG app

Bar not showing? Press Ctrl+Shift+B.

How to use it every day
  1. Open MVRing (Tp-zone) and sign in as usual.
  2. Bring up the ring diagram you want.
  3. Click Open in OSG app in the favourites bar.
  4. The app opens in a new tab with the diagram already loaded.

Supply Status

Status Station Name

Date :

WCA:

WCD:

Date Time Substation Circuit KV Pnl.No Equipt Action SCADA/Local Remarks Attended by

Date


WCA:



WCD:



Page No. 1 of       


EO / AEO's Name

Location at the time of tripping

Reaching time at the first station

Interruption Details


No. of SS

Total KVA

Interruption Time (min)


Substation



Target Time



Zone









Circuit



Type of consumer



Area








Primary Panel No.



Constraint








Voltage (KV)



Cause of fault








Start Date & Time



Sub Fault








Restoration Date & Time


Type of joint failure








Duration (min)


Faulty circuit








End Date & Time


No of SS

interrupted



Weather



Started SE-SC/ ESC


No of EO / AEO's informed


MDG Utilization log (Y/N)


No. of EFI checked


Time informed to DEM-SE



Started AEO Name



SAP updated

WCD & WCA


Switching


DCC Shift in charge Name


No. of EFI Mal- operated


For IDT / IBT TCC informed time



Finished SE-SC/ E-SC


CML


SAP data entry

by


DFO Shift in charge Name


No of CB trips on fault



Contributory Trip



Finished AEO Name


OCC

completed


NOD Serial No.

NOD Ref No.

NOD Type

NOD purpose

NOD Serial No.

NOD Ref No.

NOD Type

NOD purpose

1




3




2




4




Work permit No.

Permit Type


Type of work


Circuit / Equipment


Issue from


Issue by


Issue to

Issuing Date & Time

Working party Dept.

Clearing Date & Time


Cleared from


Cleared by


Cleared to



























⚠️ Note: Each employee is responsible for verifying the switching program before execution. This application is under testing and is not responsible for the final implementation.